Community consultation commences for the proposed Dinawan Energy Hub

Spark Renewables has commenced community consultation for the proposed Dinawan
Energy Hub – a hybrid wind, solar and battery storage project with a generation capacity of
up to 2.5 gigawatts.
The project would be located on grazing country about halfway between Coleambally and
Jerilderie and would connect to the recently committed Project EnergyConnect
interconnector which will pass through the area.

Download media release:

Community consultation commences for the proposed Dinawan Energy Hub